# CPV 45241600-4: Installation of port lighting equipment

Official label (Regulation (EC) No 213/2008):

- EN: Installation of port lighting equipment
- PT: Instalação de dispositivos para iluminação portuária
- ES: Instalación de equipo de iluminación portuaria
- FR: Installation de matériel d'éclairage portuaire

In the tree:
- 45000000-7 Construction work (https://trinta.ai/cpv/45000000)
- 45200000-9 Works for complete or part construction and civil engineering work (https://trinta.ai/cpv/45200000)
- 45240000-1 Construction work for water projects (https://trinta.ai/cpv/45240000)
- 45241000-8 Harbour construction works (https://trinta.ai/cpv/45241000)

Portuguese market, January to July 2026: 1 contract signed under this code, €197.7k contracted. Counted from the open contract register, all procedure types.

Who buys under it in Portugal (by NIF, contracts in the period):
- APA - Administração do Porto de Aveiro, SA (501431535): 1

Market: Construction and public works (https://trinta.ai/tenders-by-sector/construction)

Source: https://trinta.ai/cpv/45241600 · All codes: https://trinta.ai/cpv
