- EnglishConstruction work for electricity power lines
- PortuguêsConstrução de linhas para o transporte de electricidade
- EspañolTrabajos de construcción de líneas de conducción eléctrica
- FrançaisTravaux de construction de lignes électriques
In the other 20 official languages
Who buys under it
- EDA - Electricidade dos Açores, SA25
- Águas do Norte, SA7
- Município de Caminha1
- Município de Águeda1
Portugal publishes its complete contract register as open data, so this is counted rather than estimated. January to August 2026. The count and the value cover every procedure type; the bid figures cover open procedures only, because in a direct award the buyer chooses who bids. A mean is published from 10 open procedures up and a single-bid share from 30, so a rate on this page always rests on enough of them to mean something. All 26 divisions ranked.
Who buys under it
- SYNDICAT DES ENERGIES ET DE L AMENAGEMENT NUMERIQUE DE LA HAUTE SAVOIE (SYANE)39
- SI ELECTRICITE GAZ DE L EURE (SIEGE)15
- SYNDICAT AUDOIS D'ENERGIES ET DU NUMERIQUE SYADEN (SYADEN)9
- TERRITOIRE D'ENERGIE ARDECHE (TE 07)9
France publishes its essential procurement data, the DECP, with the number of offers received on every marché, a field its own schema makes mandatory. January to July 2026, Two things to read alongside the figures: the amount is the notified amount, which for a framework agreement is the ceiling rather than the spend; and the bid figures exclude marchés passed without publicity or competition, where a single offer is the design of the procedure. 127 competed marchés declared their offers here, 5.9 on average; the median is shown because an allotted marché repeats the whole consultation's offer count on each lot, which inflates a mean and leaves the median alone. Same bars as Portugal: a mean from 10 procedures, a single-offer share from 30. Buyers are named from their SIRET through the public company register. The French barometer and its method.
The EU Official Journal carries the same measurement for every member state: eForms requires the count of submissions received on every contract award notice. 6.8% of the 435 lots awarded under this code across the Union drew a single bid, and the median lot drew 4. Above the EU thresholds only, and the lot is the unit because one notice can award many. Where EU tenders draw a single bid.
How to cite
TRINTA, "CPV 45231400-9: Construction work for electricity power lines", Portal BASE (IMPIC), edition 5 October 2026, https://trinta.ai/cpv/45231400 (accessed [date]).
Buyers tag their notices with CPV codes, and mis-tag them often enough that a code-only alert misses real tenders. TRINTA's radar reads the notices themselves, in their own languages, and scores each one against what your company actually sells, so a procedure filed under a neighbouring code still surfaces when the text fits.
Official label, Regulation (EC) No 213/2008 (CPV 2008), via ted.europa.eu. Markdown: https://trinta.ai/cpv/45231400.md